Goksu SPP 11.1 MW has achieved COD.
28 Dec

Goksu SPP 11.1 MW has achieved COD.

Goksu Solar Power Plant with 11.1MW installed capacity has taken into operation in December 2017.

© Kinesis Enerji 2019